8 Mile Road to 9 Mile Road

Start: Spring 2025
Current Status: Pending
Projected End: 2026
Project Jurisdiction: Road Commission for Oakland County

Description

BRAD just learned that the Road Commission for Oakland County is holding a Public Meeting on October 23rd regarding their planned resurfacing of Novi Road between 8 Mile Road and 9 Mile Road. The work is currently scheduled to start in 2025.

Open House Date/Time: Wednesday, Oct. 23, 4:30 p.m. to 7 p.m.

Open House details: The meeting will be in an open‐house format; there will not be a formal presentation. Anyone interested can review plans and talk with RCOC staff at any time during the meeting.

Open House Location: Hillside Middle School, 775 N. Center St., Northville, MI 48167 (in the cafeteria).

PDF Icon Novi Info Meeting Flyer

The project will be done in two phases and will include:

  • Milling the existing pavement and repaving with two layers of asphalt.
  • Adding a continuous, center left-turn lane throughout this section of Novi Road.
  • Adding two northbound lanes and one southbound lane from the Rouge River/Allen Drive to 9 Mile Road.
  • Reconstructing the curve between 8 Mile Road and Allen Road/the Rouge River.
  • Placing curb and gutter where appropriate within the project.
  • Installing storm sewer to improve drainage.
  • Reconstructing side streets and driveway approaches throughout the project.
  • Improving pedestrian crosswalks to comply with the Americans with Disabilities Act (ADA)
  • Upgrading traffic signs and pavement markings within the project.
  • Installation of High-Intensity Activated Crosswalk (HAWK) pedestrian crosswalk beacons just north of Galway Street.

Since this is an Oakland County project, call RCOC’s Department of Customer Services at (877) 858-4804 or send an email to dcsmail@rcoc.org, or visit the RCOC Website, www.rcocweb.org, for more information.