Please note - due to the nature of road construction, inclement weather or other unforeseen circumstances, dates/times may vary. Thanks for your patience as we work to improve our roads.
Updated: 4/11/25
Start: June 2025
Current Status: Pending
End: August 2025
Project Jurisdiction: City of Novi
Progress: TBD
Description:
Over the last year, the City has been investigating and assessing the stormwater flow from the south end of Monticello Street all the way to the outfalls at Walled Lake. It has been determined that many ditches have silted in, culverts are undersized and/or severely deteriorated, and the main outfall at Walled Lake requires replacement. The City of Novi will be hiring a contractor to replace and upsize several culverts/outfalls, regrade ditches, and repave affected areas of East Lake Drive and Monticello Street back with asphalt or chip seal materials.
Traffic Control/Detours:
To accomplish this work, traffic on northbound East Lake Drive will be maintained. Southbound East Lake Drive will be detoured to east on 14 Mile Road, then south on Novi Road, west on 13 Mile Road, and back to East Lake Drive. Pedestrians will be detoured to Paramount Street around the East Lake Drive/Monticello work.