Drive, Ride, Walk Novi

2019 Road Construction Map

Map

Interactive Map   Static PDF Map

Better Roads Ahead
Stay on top of all the road construction taking place in Novi’s neighborhoods this construction season by signing up for the weekly Better Roads Ahead e-newsletter

Drive, Ride, Walk Novi

Drive, Ride, Walk Novi e - Newsletter

Please join theDrive, Ride, Walk Novi Newsletter to receive road and non-motorized construction updates via email.

Also visit the Ride & Walk Novi page to find pathway/ sidewalk maps, Walkable Novi committee information, and the Non-Motorized Master plan.

Thumbnail image of Road Video
"Why Aren't They Working on My Road?"
This video explains why roads go bad and why sometimes the worst roads aren't fixed first.

Links of Interest

Nine Mile Sanitary Relief Sewer Construction 2019 FAQs

Novi Road Construction Update Videos

MDOT Traffic Cameras

For further information, subscribe to the MDOT construction update lists.

To search for closures along any state route, click here.

MDOT’s Current Roads & Travel Conditions Site

Please continue to check this website which will be updated as possible, butMDOT has a more comprehensive (metro-wide) and current subscription service available.

Novi - Better Roads Ahead

In August 2012, Novi citizens overwhelmingly passed a road millage allowing for more than $5 million to be used in annual road and pathway investments. Funds will be used to maintain and improve neighborhood (subdivision/ side streets) and major municipal roadways (mile roads, Beck Road, etc.), and to make sidewalk and pathway connections.

The City uses a formal asset management program that categorizes roads based on a Pavement Surface Evaluation and Rating system (PASER). Roads in poor condition are candidates for reconstruction or rehabilitation. Those in fair condition receive capital preventive maintenance, while roads in good condition are candidates for routine maintenance work. The lowest rated roads in each of these categories are generally addressed first.

Special Construction Advisory

Crescent Boulevard Rehabilitation (west-side of Novi Road)

The City of Novi’s contractor (Toebe Construction, LLC) and consulting engineer (AECOM-Great Lakes) will begin work on Saturday, October 19th, on Crescent Boulevard near Novi Road which will consist of removing and replacing approximately 175-feet of deteriorated concrete on the existing portion of Crescent Boulevard, immediately west of Novi Road.

Removal and replacement of this concrete will take place in two stages. The first stage will be the rehabilitation of the interior lanes of Crescent Boulevard. The second stage will be the rehabilitation of the outer lanes of Crescent Boulevard. During the second stage, the driveway on the north side of Crescent Boulevard (into the plaza with Qdoba, Blaze Pizza, et. al.) will be CLOSED, but there will be signage instructing motorists to access those buildings via Adell Center Drive. The pavement in front of the driveway on the south side of Crescent Boulevard (Sprint) is in good condition and will not require removal.

While the inner lanes are closed (Stage 1) the left turn lane on northbound Novi Road will be CLOSED to all vehicles.

While the outer lanes are closed (Stage 2) there will be NO right turns allowed for TRUCKS ONLY onto Crescent Boulevard from southbound Novi Road.

Attached are ‘Work Plans’ for both stages to better clarify the above methodology. Each stage will take approximately one (1) week to complete.
 

Bridge Construction

We have received some updated scheduling and order from the contractor on each of the three bridges:
 
  • West Park Drive bridge over the CSX Railroad (between 12 Mile and West Road) – The contractor reopened West Park Drive bridge and closed the Meadowbrook Road bridge on Tuesday, September 17th.

  • The contractor reopened the Meadowbrook Road bridge on Friday, October 11th.
       Map - Designated Detour

 
  • The contractor will plan to close the Cranbrooke Drive bridge on Monday, October 21st. A majority of the work planned for this bridge is slated for the northbound side. All work is expected to take approximately two weeks to complete.
       Map - Designated Detour

 

To stay informed this construction season sign up for our weekly Drive, Ride, Walk e-newsletter.

Road Commission for Oakland County (RCOC) Projects

12 Mile and Novi Road Intersection Improvements
12 Mile Road Concrete Panel Replacements (East of Meadowbrook Road)
10 Mile Road Pavement Preservation Overlay (PPO) - Napier Road to Haggerty Road
Haggerty Road Pavement Preservation Overlay (PPO) - 8 to 9 Mile Road
Seeley Drain Culvert Replacments on Haggerty Road (Between 13 And 14 Mile Roads)

City of Novi - Local/Neighborhood Road Program

Concrete Streets
Asphalt Streets
Concrete Panel Replacement Program
Chip Seal Program

City of Novi - Major Road Projects

Crescent Boulevard Extension (NW Ring Road) - Novi Road to Grand River Avenue
Bond/Flint Street Construction (SW Ring Road) - Grand River Avenue to Novi Road
Cabot & Lewis Drives Rehabilitation (12 to 13 Mile & Cabot to Haggerty Road)
9 Mile Sanitary Gravity Sewer (Beck Road to Napier Road)
South Lake Drive Storm Structure Rehabilitation (13 Mile Road to West Park Drive)
Bridge Rehabilitation (West Park Drive, Meadowbrook Road & Cranbrooke Drive)
Traffic Signal Modernization (14 Mile/Haggerty & Pontiac Trail/Beck)

Temporary Road Closures

Temporary Road Closures

Potholes

Click here for more information on potholes.

Frequently Asked Questions

Below is a list of some of the most frequently asked questions as it pertains to road construction in the City of Novi. If your question is not on this list, feel free to shoot us an email at communityrelations@cityofnovi.org.

Q - Will the contractor work in front of my house on weekends?
Q - Will I always have access to my driveway?
Q - Will my driveway be replaced along with this project? If so, will it be
Q - What if I want to replace my entire driveway?
Q - Will delivery or removal service be disrupted (mail service, UPS/FedEx and trash service)?
Q - Where will I be able to pick up my mail?
Q - Will the areas of my lawn that are disturbed be replaced?
Q - Will I lose water or sanitary sewer service during construction?
Q - Will you be repairing or replacing sidewalks in front of my property along with this street construction?
Q - Will the school bus pick up my children up at the same location?
Q - Where can I park my car(s) while access to my driveway is closed?
Q - How are landscaping features and lawn irrigation systems dealt with during construction?