2016 Neighborhood Road Program

Background

Example of Repaired Neighborhood Road
Example of rehabilitated street using discrete panel replacements and partial depth joint repair.

For several years, the City Council has made it a primary goal to invest annually in neighborhood streets to maintain the city’s local road network. To implement this goal, the City selects several residential streets to be addressed based on an evaluation of the pavement condition using PASER ratings, field observations by staff, and resident concerns. Please refer to the Pavement Condition Asset Management web page for additional information on PASER ratings and Asset Management.

The 2016 Neighborhood Road Program will implement the City’s Asset Management approach for pavements that was established in 2009 and is explained in detail at the above link. The asset management program stresses the importance of using preventative maintenance to preserve good quality roads using low-cost rehabilitation techniques, rather than allowing the roads to deteriorate to a point that requires reconstruction involving much more effort at a higher cost. Roads that have deteriorated significantly are addressed with rehabilitation methods such as overlays, panel replacements, and joint repairs to allow more efficient application of available road funds to maximize the number of neighborhood streets that can be included each year in the program.

Program Details

The 2016 Neighborhood Road Program will include the rehabilitation of the roads listed below. Repair techniques to be implemented include:

  • partial-depth mill and overlay of asphalt
  • concrete panel replacement (discrete replacement of single or multiple concrete slabs)
  • joint repair (removal and replacement of failed concrete joints)
  • full-depth and partial-depth reconstruction
  • sealing cracks and joints to preserve the pavement
  • Use of pavement interlayers to help resist reflective cracking

The map below shows the streets that are being designed for completion in 2016.
2016 Neighborhood Road Construction Projects

Construction is anticipated to begin summer 2016 and would be completed by fall 2016.

For further information about this year’s project please contact George Melistas, Engineering Senior Manager, Department of Public Services at 248-735-5632.

Local Street Listing

November 16-22, 2016 Update

The City will have three programs this year: two concrete road programs and one asphalt road program. Some street segments require full reconstruction of the existing pavement, while others may require patching or a rehabilitation type of replacement effort. See the table of street segments below and a projected status of each:

Huntingcross Dr. from Eaton Ct. to Steeple Path, Dunbarton Pines
Concrete Pavement
Joint/Panel Replacements
Complete and Open

Eaton Ct. from Huntingcross Dr. to End, Dunbarton Pines
Concrete Pavement
Reconstruction
Complete and Open

Alton Ct. from Huntingcross Dr. to End, Dunbarton Pines
Concrete Pavement
Reconstruction
Complete and Open

Dunbarton Dr. from Waycroft Dr. to Steeple Path, Dunbarton Pines
Concrete Pavement
Joint/Panel Replacements
Complete and Open

Dunbarton Dr. from Steeple Path to Dunbarton Ct., Dunbarton Pines
Concrete Pavement
Reconstruction
Complete and Open

Upland Hills Dr. from Park Ridge Rd. to Cherry Hill Rd., Meadowbrook Glens
Concrete Pavement
Reconstruction
Complete and Open

Ridge Rd. W. from Park Ridge Rd. to Cherry Hill Rd., Meadowbrook Glens
Concrete Pavement
Reconstruction
Complete and Open

Ridge Rd. E. from Park Ridge Rd. to Cherry Hill Rd., Meadowbrook Glens
Concrete Pavement
Reconstruction
Complete and Open

Applecrest Dr. from Highland Dr. to Cherry Hill Rd., Meadowbrook Glens
Concrete Pavement
Joint/Panel Replacements
Complete and Open

City Parking Lot from Ten Mile Rd. to End, Novi Fire Station No. 4
Concrete Pavement
Joint/Panel Replacements
Front parking lot removals and replacement this week

Marlson Ave. from Clark St. to End, Novi Heights Sub.
Asphalt Pavement
Crush, Shape & Overlay
Top course asphalt on 11/15 and 11/16

Durson St. from Clark St. to End, Novi Heights Sub.
Asphalt Pavement
Crush, Shape & Overlay
Top course asphalt on 11/15 and 11/16

Stassen Ave. from Clark St. to End, Novi Heights Sub.
Asphalt Pavement
Crush, Shape & Overlay
Top course asphalt on 11/15 and 11/16

Clark St. from Marlson Ave. to Stassen Ave., Novi Heights Sub.
Asphalt Pavement
Crush, Shape & Overlay
Top course asphalt on 11/15 and 11/16

Cortland Blvd. from Ten Mile Rd. to Hickory Grove Ln., Orchard Ridge Sub.
Asphalt Pavement
Reconstruction
Top course asphalt on 11/15 and 11/16